RATP Dev to operate and maintain Cairo Metro Line 3
Egypt’s National Authority for Tunnels and RATP Dev signed a €1.138bn contract for the operation and maintenance of Cairo Metro Line 3 for a period of 15 years.
Egypt’s National Authority for Tunnels and RATP Dev signed a €1.138bn contract for the operation and maintenance of Cairo Metro Line 3 for a period of 15 years.
Cairo Metro Line 3 Phase 4B extension serves 6 stations at El-Nozha, Hisham Barakat, Qobaa, Omar ibn El Khattab, Hikestep and Adly Mansour. A depot with 31 buildings was built at Adly Mansour.